Moving in…sort of

I’m so embarrassed at how behind I am on updates. I’ll take a video tour for you in the next few days to update you appropriately. Since our last update, we’ve:

  • Finished all insulation
  • Finished the cedar on the walls
  • Installed all doors
  • Installed rafters on the ceiling
  • Sanded and sealed the floors
  • Installed outlets to complete the electric (more or less–there’s still lights to be put in a few places)
  • Installed the closet
  • Moved in living room and bedroom furniture as of yesterday

As you can tell, things have been a little busy. But the big news is–tonight is our second night to sleep inside! We don’t have the bathroom or kitchen finished, obviously, so we’re still running over to the camper for bathing and cooking needs. It’s right outside the bedroom though, so it’s not particularly inconvenient.

It’s such a pleasure to be in my own bed. We bought a new mattress, and our bed is a king, so the comfort level at this point is a marked improvement from camper sleeping.

A few notes:

Closet: We elected not to build our closet in. Instead, Scott welded brackets to the wall where we wanted the closet zone to be. We hung a clothing rod from those brackets. It sounds a little odd, but it’s working well so far. We might hang a sheer across the front if we decide the clothes being exposed isn’t what we want.

The space: Now that we have furniture in, I’m pretty happy with the dimensions of the space. Our living area is just right for our couch, overstuffed chair, and entertainment stand. There’s also going to be enough room for the wardrobe I’m putting in for winter jackets, umbrellas, and boots, without things seeming crowded.

There’s a nice open space against the wall separating our bedroom from the living space. Don’t get me wrong, we’ve still got some clearing out to do as we continue moving in (and moving out of the storage unit), but we’ve never been big clutter-collectors, so I think we can keep the minimalist vibe going.

I feel like I’m in a palace. I can’t begin to tell you how much space I feel like I have.

Advertisements

Status Update

Things are moving right along. Scott started (and got a long way) with putting up walls. We’re hoping to be finished with that by maybe Friday or Saturday. Then we’ll put in the windows and doors, sand the floors, add some plumbing, and move right in!

*And we just bought the sliding glass doors. Sweet sauce.

Okay it will still probably be like a month, but that’s so close!

I know what you’re really interested, and I do live to serve, so here’s a little video tour. This is from Sunday-ish, so it’s pretty current. We’ve finished the bedroom walls at this point, so that’s the only thing significant that’s changed.

In other news, I got chickens! I picked them up two weeks ago tomorrow, I believe, so they’ve been cooped to learn where home is, but tonight, they’re going for an evening walk. I’m sure I’ll take video. If you’re interested in that kind of thing, you can check out our home blog HERE at twoacrehill.wordpress.com. I thought about adding it all to this site, but I’m aware some of you may not be into that, so I’ll try to keep those posts more or less separate.

Insulation

IMG_2132

Close-up of insulation on walls.

Scott’s been working pretty steadily the last couple of weeks (thanks to a few relatively quiet days) on the insulation.

He’s using construction adhesive to attach the insulation to the walls. On the walls, this has been working great. He just leans a beam or 2x against the panel to hold it in place while it sets, and they set pretty quickly.


Unfortunately, the panels on the ceiling are taking a little longer to set. To hold those in place, he built several Ts. It’s still working well, just taking a little longer.

The large pieces went in quickly. It’s all the small spaces left that have to be measured and custom that are a little slower going, but I’m told it’s not too big of a deal.

If we were doing this again, and could know in advance, one could put up studs spaced exactly to fit one panel of insulation between each, eliminating cuts except for around electrical outlets.

A note on the outlets: You may notice they’re close to the floor. 18 inches up is code, but you can have them lower if you install GFCI outlets. (I’m no code expert, check your local regulations, yada yada yada.)

Plans for the next week include: finishing the insulation, cutting a hole for the HVAC unit/installing it, and starting on plumbing installation.

A few more pics. Click for a larger image.

IMG_2153

Bedroom ceiling. The small hole is for the dedicated bedroom air conditioner.

The intersection between the kitchen area, bathroom, and bedroom.

The intersection between the kitchen area, bathroom, and bedroom.

We’re covering the walls with cedar board, which I’m going to whitewash. It’s going to be gorgeous! Here’s a link to what I’m thinking: Whitewashing Plank Walls

Insulation

Last week, we found closed-cell insulation panels on Craigslist. So, off we went on an hour drive. We bought 1000sf of two-inch foam and 1000sf of four-inch foam–for the low price of $1,000 total! The two-inch foam has an R-value of 16. The minimum required by code in our area is 13, so we’re ahead of the game. The ceiling, of course, should have more insulation, and I think we’re about 3-4 R-levels higher than the minimum.

We’re better-than-required kind of folks. Ha.

We’re installing it by gluing it directly to the metal walls between the framing studs. Apparently it functions as a moisture barrier if used by itself, which is good. Scott is going to put in a couple of solid days on it this weekend, so I’ll post some pics when progress is made.

Here’s a pic of all the foam in our trailer:

IMG_2082

Yeah. It’s a lot.

And, for fun, here’s one of the pile as we were picking it up. Yes, I stayed in the truck and let the dudes load it.

IMG_2079 2

We are leaving the sections that still need windows installed un-insulated. After the insulation is put in, and we get the funds for windows, Scott will cut out the metal where the windows will go, frame and install them, then finish insulating those areas.

Next comes plumbing, installing cabinets/appliances/shower, and then we can MOVE IN! We’re ready, so we’re going to do all the finish work (painting, putting up covering over the insulation, etc) once we move in.